Our Gallery
Our Gallery
Fossilcote is a team of professional epoxy flooring specialists that have over 15 years of experience, and we are uniquely qualified in analyzing a facility’s flooring needs. Whether a floor is slippery, unattractive, soiled, requires moisture mitigation, cracking, or peeling, Fossilcote can provide a solution.
Frequently Asked Questions.
- What kind and how much traffic will the floor be exposed to?
- Is slip resistance going to be an important factor?
- Are aesthetics, color, design, and light reflectivity important?
- Will the floor have an industrial look or will it be decorative to match existing design?
- Does the facility have any known or existing moisture issues?
- What types of chemicals will be used, or stored on the floor?
- Will there be UV exposure to the epoxy system?
- What are the waterproofing needs of the facility?
- Will the health or agricultural department’s requirements for food preparation and storage need to be met?
- Step 1: Site Visit, Estimate, Consult & Selections: 1-6 weeks.
- Step 2: Planning and Delivery of Products: 1-8 weeks.
- Step 3: Installation: 1 – 5 days.
- Step 4: Return to Service: 12 hours – 4 days depending on the system type.
We have the ability for some jobs to get it done the same week. It’s not a guarantee, but it’s worth giving us a call for any last-minute flooring needs.
Fossilcote has been installing floor coatings and epoxy systems for over 20 years.
Over that time, we’ve developed many long-lasting relationships and happy customers.
Fossilcote works with several large and small high-quality manufacturers.
They are leaders in research and development of coating technologies, continuing training and education in current trends in the industry, and local rep and tech support.
Our customer service and the desire to see a project through is what separates us.
We continue to solve challenges so that the resulting product is a floor that our customers our happy with.
This answer is highly variable based on use case and if proper care is taken to ensure maximum lifespan. These floors typically last 10-20 years. The prep and priming is the part of the system that will hold for a long time. Over that time, a finishing re-coat can be applied to freshen up the floor at a fraction of the cost of removing and re-installing a new system.
- This an inexpensive way to add even more years to your epoxy system.
- “Your staff was very responsive and worked well with our team. BTW the floor looks fantastic!!”
- “It was great working with you. Thanks again to your crews for all of their great work.”
- “Please pass on to your staff that they did a nice job and they were so easy to work with.”
- “Thank you, Craig, our locker room floors look great. Your guys were great to work with very professional. Thank You.”
Get A Free Estimate
Fill out the form to receive a FREE estimate customized to your project requirements. You will receive a reply within 1-3 business days.